Adaptive reuse construction — gymnasium conversion
Project Management Under Construction

Adaptive Reuse: School Gym to Residential

Converting a former school gymnasium into modern residential units in Cambridge, Ontario — managed through Festbau's Project Management delivery.

Project

Adaptive Reuse: Gym to Residential

Location

Cambridge, Ontario

Delivery

Project Management

Value

$2.5M

Status

Under Construction

Duration

12 Months (Est.)

Scope of Work

What We Are Delivering

assignment

Adaptive Reuse Planning

Comprehensive conversion planning from institutional gymnasium to residential use, including zoning, code compliance, and structural assessment.

view_timeline

Phased Execution

Structured execution in defined phases — demolition, structural reinforcement, MEP rough-in, framing, finishes — with clear milestone gates.

verified

Quality Control

Ongoing inspections and QA/QC protocols to ensure residential-grade finishes, life-safety compliance, and building code adherence at every stage.

key

Turnover Readiness

Coordinating final inspections, occupancy permits, tenant readiness, and full documentation packages for a clean handover to the owner.

Problem Solving

Challenges & Solutions

warning

Challenges

error
Adaptive Reuse Complexity

Converting a gymnasium into residential units involves fundamental changes to structural layout, floor levels, window openings, and unit demising walls — requiring creative engineering solutions.

error
Life-Safety Upgrades

The change of use from institutional to residential triggers extensive fire protection, egress, and accessibility upgrades to meet current Ontario Building Code requirements.

error
MEP Coordination

Routing new mechanical, electrical, and plumbing systems through an existing structure with non-standard ceiling heights and limited chase space presents significant routing challenges.

lightbulb

Solutions

check_circle
Phased Execution Plan

Developed a detailed phased execution plan with clear milestone gates — allowing each phase to be fully inspected and approved before the next begins, reducing rework risk.

check_circle
Active Constraint Management

Maintaining a live constraint log with weekly reviews — identifying and resolving blockers before they impact the critical path or trigger costly rework.

check_circle
Multi-Trade Coordination

Weekly coordination meetings with all trades to resolve spatial conflicts, align installation sequences, and ensure life-safety systems are properly integrated with residential layouts.

Progress

Current Results & Milestones

This project is currently under construction. Results are being tracked in real time.

trending_up

On Track

Schedule Status

Currently tracking to the original 12-month estimated completion timeline with no material delays.

workspace_premium

Met

Quality Benchmarks

All completed phases have passed inspection with zero non-conformance reports issued to date.

forum

Active

Stakeholder Coordination

Regular reporting to the owner, municipality, and design team — maintaining alignment across all parties.

account_balance_wallet

$2.5M

Budget Target

Project costs are tracking within the approved $2.5M budget with contingency intact.

Project Gallery

Construction Progress

Gymnasium interior before conversion
Structural reinforcement work
Interior framing for residential units
MEP rough-in installation
Building exterior renovation
Construction site aerial view
format_quote

“Client testimonial coming soon.”

person

Project Owner

Adaptive Reuse — Cambridge, Ontario

Have a Similar Project in Mind?

Share your project scope, timeline, and constraints. Our team will outline a clear plan of action.